Trondheim district heating facility
Gardermoen district heating
The district heating plant at Gardermoen opened in 1998.
-
1998Entered into operation
-
47 MW装机容量
-
68.9、妇女年生产
mg游戏官方网站 Varme took over the plant and the district heating network at Gardermoen in November 2015 and has since been responsible for operating the facility.
The main network is 20 kilometres long and supplies several large commercial buildings, the largest being Oslo Airport Gardermoen.
The district heating plant at Gardermoen chiefly makes use of bio-energy sourced from the local area. Peak load requirements are met by electric boilers and heating oil.